Since its inception in June 2010, Conifer Environmental has been involved in a number of environmental projects:
Environmental Media Sampling and Consulting
Client: WATTS Constructors, LLC
Location: MI Battalion Headquarters, Fort Carson, Colorado
Duration: June through October 2010
Project Description: Provided environmental consulting services during construction of the MI Battalion Headquarters. Services included soil and groundwater sample collection, compliance documentation and reporting, and liaison between WATTS Constructors LLC and Colorado Department of Labor and Employment, Division of Oil and Public Safety (OPS).
Groundwater Monitoring Well Installation and Development
Client: Summit Technical Resources, Inc. (Summit)/Department of Public Works, Environmental Division (DPW-ED)
Location: Petroleum, Oils, and Lubricants (POL) Point, Piñon Canyon Maneuver Site (PCMS), Model, Colorado
Duration: April through June 2011
Project Description: Served as lead geologist and technical consultant for Summit Technical Resources, Inc. during ongoing subsurface investigation at the PCMS POL Point. Activities included borehole advancement and logging, groundwater monitoring well installation and development, and technical reporting.
UST/AST Compliance Support
Client: Summit/DPW-ED
Location: Fort Carson, Colorado
Duration: June 2011 to January 2012
Project Description: Performed monthly/annual compliance inspections on 212 aboveground storage tanks (ASTs) and 24 underground storage tanks (USTs) at Fort Carson and PCMS, redesigned and updated the UST/AST databases, revised the Fort Carson Spill Prevention, Countermeasures and Control Plan, drafted technical documents including Standard Operating Procedures and Memoranda of Agreements between various military agencies.
Fuel Product Extraction
Client: Summit/DPW-ED
Location: PCMS POL Point, Model, Colorado
Duration: September through October 2011
Project Description: Performed enhanced fluid recovery utilizing a variety of field techniques in response to a gross fuel release.
Environmental Consulting and Media Sampling
Client: Tepa EC, LLC
Location: EAB Company Operations Facility, Fort Carson, Colorado
Duration: August 2011 to Current
Project Description: Providing environmental consulting services during construction of the EAB Company Operations Facility. Services include supporting Tepa EC in discussions and correspondence with OPS, and Colorado Department of Public Health and the Environment, and conducting compliance documentation and reporting, AST Transfer-of-Ownership, and soil and groundwater sample collection.
Soil Vapor Monitoring Point Abandonment and Relocation
Client: Tepa EC, LLC
Location: FY10 Company Operations Facility, Fort Carson, Colorado
Duration: April to May 2012
Project Description: Abandoned and relocated/reinstalled a soil vapor monitoring point. Included driller oversight, geophysical logging, and report submittal.
Stormwater Pollution Prevention Plan (SWPPP) Inspections
Client: Komada, LLC
Location: Leo/Grace Lake Dams at Farish Memorial Recreational Annex, Air Force Academy, Colorado
Duration: July 2012 to May 2013
Project Description: Performing bi-weekly stormwater inspections and updating SWPPP at a multiple dam repair project for the Air Force and US Army Corps of Engineers.
Environmental Media Sampling
Client: KIRA, Inc.
Location: Building 2992, Fort Carson, Colorado
Duration: December 2012 to January 2013
Project Description: Performed soil characterization on a utility upgrade project at this facility.
Partnerships
Conifer is currently partnered with Tepa EC, LLC and GEI Consultants, Inc., for future governmental contracts.